Good evening
In a production system there are houndred of Jobs running and i�ve got to monitor all of them, but the problem arises when a job running takes much longer or conversely takes nothing and as operator is almost imposible to detect the m�ximum or m�nimum threshold for a running job.
Ive tried to find out to to set up A11 to notify me by means of an alarm or whatever what is the the m�ximum or m�nimum threshold for a running job ?
Thanks in advanced